Traffic impacts
Over the course of the project, the rehab work is expected to require nightly lane closures so the contractor can safely advance work.
- Nighttime lane closures are anticipated between the hours of 9:30 pm and 5 am (8 am on weekends)
- For the duration of the closures, one lane will remain open to traffic in each direction to minimize the traffic impact at night
- Motorists will see some congestion at the start of the evening shift until traffic volumes subside
For the latest information on road conditions, visit DriveBC.
The project will involve:
- Condition renewal of the existing bridge deck: The deck renewal consists of joint repair/replacement, deck drains replacements, and resurfacing of the deck with new polyester polymer concrete (PPC) overlay.
- Miscellaneous repairs to concrete components of the bridge, including repairs to the sidewalk.
Status
Project updates will be available on this website.
Schedule
This work will take place from spring 2026 and be completed in the of fall 2027
Project benefits
This project will benefit the community by:
- Extending the service life of the bridge through deck, joint, drainage, and concrete rehabilitation.
- Improving structural safety and reliability by repairing deteriorated concrete and replacing critical components.
- Reducing long-term maintenance and lifecycle costs by addressing water infiltration and corrosion-related deterioration.
- Enhancing road user and pedestrian safety with a smoother riding surface, renewed joints, and improved sidewalks.
Project cost
The construction contract was awarded to Kingston Construction Ltd. for $20.8 M.
Project map

Queensborough Bridge located in Highway 91A