Highway 7 and 11 Cedar Valley Connector Intersection Improvements

Last updated on June 17, 2024

Intersection at Highway 7 and 11 with traffic backed up at a red light

Upgrades at Highway 7 and Highway 11 Cedar Valley Connector intersection to improve safety and turning lane capacity, and to reduce highway congestion.

Schedule of activities

  • Project construction will begin in late June and is targeted for completion by October 2024
  • To maintain daytime highway travel, construction will occur during nighttime, typically from 9 pm to 5 am
  • Construction impacts may include on-site and vehicle lighting and some noise from vehicle engines, generators or paving equipment
  • Please watch for and obey traffic control signs and personnel which are in place for everyone’s safety
  • For the latest information on road conditions, please visit DriveBC

Highway 7 and Highway 11 are vital routes that connect people and businesses in Mission and throughout the Fraser Valley.

Planned intersection improvements at Cedar Valley Connector will make it safer and easier for people to move through the intersection. These intersection upgrades follow Phase 1 improvements completed in the west quadrant of the intersection in 2018.

The project supports the City of Mission’s Master Transportation Plan in addressing intersection safety and highway capacity.

Safety improvements include:

  • Adding a second dedicated northbound turn lane on Highway 11 to add more lane capacity to left turns from Highway 11 to Highway 7 westbound
  • Increasing the lane capacity of the Highway 7 westbound left turn lane
  • Modifying intersection traffic islands to improve the turning radius for trucks and vehicles
  • Relocating and installing new road signs to guide drivers into lane assignments
  • Updating roadway drainage to accommodate the new lane configurations
  • Upgrading lighting and traffic signalling to support operation changes and the addition of the dual left-turn bay

Project location

Map

Status

  • Contract awarded to B.A. Blacktop Infrastructure Inc.
  • Construction will take place from summer to fall 2024.

Project cost

The project budget is $5 million.

Project benefits

The project will:

  • Improve intersection safety, reduce the likelihood and severity of collision incidents at Highway 7 and Highway 11 Cedar Valley Connector
  • Improve traffic safety for the travelling public and goods movers, with enhanced turning lane capacity, upgraded lighting, road signs and paving
  • Improve travel time and reliability through City of Mission, with coordinated traffic signal operations to enhance intersection efficiency, reducing motorist idling and greenhouse gas emissions
  • Support community and economic development, with improved access to places people live, work and play including within the cities of Mission, Abbotsford and Pitt Meadows

Contact information

Friendly url for this page:

gov.bc.ca/Highway7and11intersection

For information about this project, contact