Submission for Tenders Expires: June 27, 2025
Project Number: 26355-0001
Contract ID: 26355MJ0001
Location: The Site is located on Highway 8 Merritt to Spences Bridge, situated approximately 48km West of the intersection with Highway 97C/Mamit Lake Road.
Description: The general nature of the scope of work to be carried out under the Contract consists of the following: Haul and installation of Revetment Riprap, supply and installation of culvert, haul and placement of base course gravels, removal and stockpile of HFSA, Type D excavation, bottom and top lift paving, removal, stockpile, and reinstallation of CRB, supply and placement of large woody debris, and revegetation seeding.
Document
Number
|
Document Description
|
1
|
Highway 8 Corridor Re-instatement Project E Sites 16-19 Environmental Management Plan by McElhanney Ltd. and Associated Environmental Consultants Inc., December 2024
|
2
|
Highway 8 Corridor Re-instatement Environmental Management Plan by McElhanney Ltd. and Associated Environmental Consultants Inc., December 2024
|
3
|
Highway 8 Corridor Re-instatement Water Management Plan by McElhanney Ltd. and Associated Environmental Consultants Inc., August 2024
|
4
|
Project E – IFT Geotechnical Memo by AECOM Canada ULC., April 14, 2025
|
5
|
Highway 8 Reinstatement Project Projects D, E, F Temporary Works Geohazard Risk Assessment, by Thurber Engineering Ltd., February 13, 2025
|
6.1
|
Hwy 8 Geotechnical Completion Memos Site 16, by Ecora, March, 2023
|
6.2
|
Hwy 8 Geotechnical Completion Memos Site 17, by Ecora, March, 2023 |
6.3
|
Hwy 8 Geotechnical Completion Memos Site 18, by Ecora, March, 2023 |
6.4 |
Hwy 8 Geotechnical Completion Memos Site 19, by Ecora, March, 2023 |
7 |
Hwy 8 Pavement Assessment Memos LKI 34+760 to 56+265, by Ecora, February 14, 2024 |
8 |
Hwy 8 Recovery Project E Hydrotechnical Design Brief Final Report, by Kerr Wood Leidal Associates, April 9, 2025 |
9 |
Project E – Sites 16-19 Drainage Design Memorandum, by AECOM Canada ULC., April 7, 2025 |
10 |
Hwy 8 Site 17 Stockpile Photos, by Thurber Engineering Ltd., December 2, 2024 |
11 |
Site 17 Past Testing, Riprap testing of materials |
12 |
Phase 1 Traffic Management Plans |
13 |
Highway 8 km 6 to km 8 East of Spences Bridge Washouts, Site 16-19 Reference Cross Sections |
14 |
Highway 8 km 6 to km 8 East of Spences Bridge Washouts, Sites 16-19 Hydrotechnical Reference Cross Sections |
15.1 |
Highway 8 km 6 to km 8 East of Spences Bridge Washouts, Sites 16-19 Utility Impact Drawings (Sites 16-17) |
15.2 |
Highway 8 km 6 to km 8 East of Spences Bridge Washouts, Sites 16-19 Utility Impact Drawings (Site 18) |
16 |
Highway 8 km 6 to km 8 East of Spences Bridge Washouts, Sites 16-19 Staging x-sections (Site 18) |
17 |
Barrier Gate_canridge [13721] |
18 |
In-line Check Valve PDSS-48-790-21-2 |
19 |
Site 11 stockpile sketch R2-1278-1400 |
20 |
STE 16-17_2300.zip (Tender Data) |
21 |
STE 18_2300.zip (Tender Data) |
22 |
STE 19_2300.zip (Tender Data) |