Project No. 26355-0001

Last updated on May 30, 2025

Highway 8 Km 6 to Km 8 East of Spences Bridge Washouts Sites 16-19


Submission for Tenders Expires: June 27, 2025

Project Number: 26355-0001

Contract ID: 26355MJ0001

Location: The Site is located on Highway 8 Merritt to Spences Bridge, situated approximately 48km West of the intersection with Highway 97C/Mamit Lake Road.

Description: The general nature of the scope of work to be carried out under the Contract consists of the following: Haul and installation of Revetment Riprap, supply and installation of culvert, haul and placement of base course gravels, removal and stockpile of HFSA, Type D excavation, bottom and top lift paving, removal, stockpile, and reinstallation of CRB, supply and placement of large woody debris, and revegetation seeding.

 

Document
Number

Document Description

1

Highway 8 Corridor Re-instatement Project E Sites 16-19 Environmental Management Plan by McElhanney Ltd. and Associated Environmental Consultants Inc., December 2024

2

Highway 8 Corridor Re-instatement Environmental Management Plan by McElhanney Ltd. and Associated Environmental Consultants Inc., December 2024

3

Highway 8 Corridor Re-instatement Water Management Plan by McElhanney Ltd. and Associated Environmental Consultants Inc., August 2024

4

Project E – IFT Geotechnical Memo by AECOM Canada ULC., April 14, 2025

5

Highway 8 Reinstatement Project Projects D, E, F Temporary Works Geohazard Risk Assessment, by Thurber Engineering Ltd., February 13, 2025

6.1

Hwy 8 Geotechnical Completion Memos Site 16, by Ecora, March, 2023

6.2

Hwy 8 Geotechnical Completion Memos Site 17, by Ecora, March, 2023

6.3

Hwy 8 Geotechnical Completion Memos Site 18, by Ecora, March, 2023
6.4 Hwy 8 Geotechnical Completion Memos Site 19, by Ecora, March, 2023
7 Hwy 8 Pavement Assessment Memos LKI 34+760 to 56+265, by Ecora, February 14, 2024
8 Hwy 8 Recovery Project E Hydrotechnical Design Brief Final Report, by Kerr Wood Leidal Associates, April 9, 2025
9 Project E – Sites 16-19 Drainage Design Memorandum, by AECOM Canada ULC., April 7, 2025
10 Hwy 8 Site 17 Stockpile Photos, by Thurber Engineering Ltd., December 2, 2024
11 Site 17 Past Testing, Riprap testing of materials
12 Phase 1 Traffic Management Plans
13 Highway 8 km 6 to km 8 East of Spences Bridge Washouts, Site 16-19 Reference Cross Sections
14 Highway 8 km 6 to km 8 East of Spences Bridge Washouts, Sites 16-19 Hydrotechnical Reference Cross Sections
15.1 Highway 8 km 6 to km 8 East of Spences Bridge Washouts, Sites 16-19 Utility Impact Drawings (Sites 16-17)
15.2 Highway 8 km 6 to km 8 East of Spences Bridge Washouts, Sites 16-19 Utility Impact Drawings (Site 18)
16 Highway 8 km 6 to km 8 East of Spences Bridge Washouts, Sites 16-19 Staging x-sections (Site 18)
17 Barrier Gate_canridge [13721]
18 In-line Check Valve PDSS-48-790-21-2
19 Site 11 stockpile sketch R2-1278-1400
20 STE 16-17_2300.zip (Tender Data) 
21 STE 18_2300.zip (Tender Data)
22 STE 19_2300.zip (Tender Data)