Project No. 26243-0002

Last updated on August 19, 2025

Highway No. 97 Cottonwood Hill Phase 3


Submission for Tenders Expires: September 18, 2025

Project Number: 26243-0002

Contract ID: 26243MJ0002

Location: The Site is located on Highway No. 97 in the North Cariboo Service Area approximately 14 km north of the City of Quesnel within LKI Segment 1151 from km 14.30 to km 14.63.

Description: Phase 3 (of 3 phases) of the project includes slope re-grading and erosion protection and installation of 252 steel piles.

 

Document
Number

Document Description

1

Project No. 26243-0002 – Highway No. 97 Cottonwood Phase 3 – Cross Sections Set

2

Project 26243-0002 – Construction Tender Data Package

3

Potential Laydown Area Drawings

4

Project 26243-0001 – Highway No. 97 Cottonwood Hill Phase 2 Drawings


5

Cottonwood River Slide – Geotechnical Data Report –
2021–2022 – BGC Engineering, November 2023

6

Cottonwood River Slide – Geotechnical Design Report –Phase 2 – BGC Engineering, April 2024

7

Cottonwood River Slide – Geotechnical Data Report –
2023 Site Investigations – BGC Engineering, March 2024

8

Cottonwood River Slide – Geotechnical Data Report –
Q1 2024 Site Investigation – BGC Engineering, August 2024

9

Cottonwood Hill – Geotechnical Data Report –
2025 Site Investigation – BGC Engineering, April 2025

10

Highway 97 at Cottonwood Hill – Geotechnical Design Report – Phase 3 – BGC Engineering, July 2025

11

Technical Memo Phase 2: Highway 97 Cottonwood Slide Project, Quesnel BC – McElhanney, January 2024

12

Technical Circular T-03/20 Step A Screening Summary – Cariboo Road Recovery Project: Cottonwood Hill Area (the “Site”) – McElhanney, October 2024

13

Cottonwood Hill Phase 3 – Umiti Pit Road South Disposal Site – Geotechnical Assessment – BGC Engineering, July 2025

14

Cottonwood River Slide – Groundwater and Soil Chemistry Testing Results – BGC Engineering, August 2024

15

Cottonwood Hill – Instrumentation Readings Summary – BGC Engineering – April 18, 2024

16

Cottonwood Hill – Instrumentation Readings Summary – BGC Engineering – June 5, 2024

17

Cottonwood Hill – Instrumentation Readings Summary (No. 3)  – BGC Engineering – September 19, 2024

18

Cottonwood Hill – Instrumentation Readings Summary (No. 4)  – BGC Engineering – November 5, 2024

19

Cottonwood Hill – Instrumentation Readings Summary (No. 5) – BGC Engineering – December 31, 2024

20

Cottonwood Hill – Instrumentation Readings Summary (No. 6) – BGC Engineering – May 16, 2025

21

Cottonwood River Slide – Phase 2 Umiti Pit Stockpile – Geotechnical Assessment – BGC Engineering, June 2024