Project No. 17207-2025

Last updated on June 13, 2025

Asphalt Resurf.: H4 Port Alberni Area: Taylor River Flats Bridge to Sutton Pass Summit ( 7 Lane Km)


Submission for Tenders Expires: July 8, 2025

Project Number: 17207-2025

Contract ID: 17207MJ2025

Location: Port Alberni Area:  H4, Taylor River Flats Bridge to Sutton Pass Summit

Description: Rehabilitation consists of resurfacing and base repairs.  Resurfacing involves 60mm milling with an additional 40mm asphalt overlay.  Base repairs of up to 1.2m depths.

 

Document
Number

Document Description

1

ATHS6000-1992-2004 – Aggregate Test Hole Summary Sheet
 

2

AGC6000-2004 – Sieve Analysis Report
 

3

SSutton_6000_LocPlan – Location Plan
 

4

SSutton_6000_Pit Plan – Pit Plan South Sutton Creek Pit #6000