Submission for Tenders Expires: June 22, 2023
Project Number: 25311-0000
Contract ID: 25311MJ0000
Location: 1.2km south of Highway 6 on Creighton Valley Road. Approximately 3km east of Lumby, or 29km east of Vernon.
Description: This project will replace the Daly Bridge on Creighton Valley Road, located near Lumby BC. During construction, a temporary detour bridge will be installed on the downstream side of the bridge to act as a detour to ensure safe and effective traffic movement. Work consists of, but is not limited to, mobilization, traffic management, bridge construction, detour construction and maintenance, drainage improvements and channel works, paving, signage, fencing, seeding and landscaping.
Document |
Document Description |
---|---|
1 |
|
2 |
|
3 |
Hankey Darby Pit No. 0429 - 2022 Technical Information Report |
4 |
|
5 |
|
6 |
|
7 |
|
8 |
|
9 |
ALC Decision Letter |
10 |
Hydrotechnical Design Report |
11 | Cross Sections |
12 | Legal Land Surveys |