Work continues, repairing and increasing the resiliency of locations on the Sunshine Coast that were affected by the November 2021 atmospheric river event. Permanent construction repairs for all sites began in summer 2024, the construction at Kenyon Creek is complete. Construction at Day Road and Flume Creek will be completed by November 2025.

From November 13 to 15, 2021, a heavy rainstorm known as an atmospheric river event caused extensive damage to highway infrastructure, including several roads and culverts on the Sunshine Coast, including the following three project sites:


Kenyon Creek

Put alternative text to describe image in info box

  • Redrooffs Road Culvert (crossing at Cove Beach Road)

Flume Creek

Put alternative text to describe image in info box

  • Margaret Road Culvert
  • Beach Avenue Culvert

Day Road 

Put alternative text to describe image in info box

  • ​Day Road at Gough Creek
  • Day Road at Clack Creek