2021 B.C. Highway Flood Recovery Projects - Highway 7
Location
- Highway 7 - Coquitlam to Hope
Conditions
- Highway 7 is currently open without restrictions.
- Check DriveBC for conditions and events that may be affecting Highway 7
Status
Seabird Bluff Slide
-
Preliminary geotechnical and hydrotechnical assessments have been completed. Preliminary design is currently being developed with 100% Detail Design being completed by Winter 2022. The project will be going to tender by Spring 2023 with construction in the Summer 2023.
Highway 7 surrounding area/side roads
-
Sterling Road erosion long term mitigation work is to begin Fall 2022 with completion by Winter 2022
-
All other sites along highway 7 have been completed