Errata & Revisions

Last updated on April 10, 2024

Errata and historical revisions for the BC Building, Plumbing, and Fire Codes from 2006 onward.

On this page:

 BC Building Code 2024

 

BC Building Code 2024 revisions 

  • BCBC Revision 1 (PDF). Amendments to provisions for encapsulated mass timber construction to enable taller mass timber buildings, additional building occupancies, and changes to encapsulation requirements in Ministerial Order BC 2024 1 - effective date: April 10, 2024
    • BCBC EMTC code change convenience copy (PDF). Provides Code language in force. These changes will be consolidated into the BC Building Code 2024 in the near future. 
    • For more information about mass timber construction in B.C., please visit the mass timber website.

 

BC Fire Code 2024

 

BC Fire Code 2024 revisions 

  • BCFC Revision 1 (PDF). New requirements related to construction of tall wood buildings in Ministerial Order FSA 2024 01 - effective date: April 10, 2024

 

BC Building and Plumbing Code 2018 

Expand All | Collapse All

 

BC Building Code 2018 revisions

    BCBC Revision 4 (PDF). Amendment to tall wood jurisdiction specific requirement in Ministerial Order 2020 7 - effective date: September 21, 2020
  • BCBC Revision 3 (PDF). Amendment to adopt the 2016 edition of the CSA Safety Code for Elevators and Escalators in Ministerial Order BC 2019 3 - effective date: April 30, 2020
  • BCBC Revision 2 (PDF). Amendments to secondary suites, carbon monoxide detectors and alarms, the BC Energy Step Code, lighting in recycling rooms, roof-top enclosures and roof-top occupancies, and tall wood jurisdiction specific requirements in Ministerial Order BC 2019 6. Effective December 12, 2019
  • BCBC Revision 1 (PDF). Amendments to BC Energy Step Code and radon requirements in Ministerial Order BA 2018 2 - effective date: December 10, 2018

 

BC Fire Code 2018

 

BC Fire Code 2018 Revisions

 

BC Building and Plumbing Code 2012

 

BC Building Code 2012 Errata

Errata list (PDF) for the 2012 BC Building and Plumbing Code

 

BC Building Code 2012 Revisions

  • BCBC Revision 12 (PDF). Changes to window guard relaxations, the BC Energy Step Code and  Letters of Assurance Schedules. Effective January 31, 2018
    • Letters of Assurance Schedules, effective January 31, 2018
  • BCBC Revision 11 (PDF). BC Energy Step Code - effective April 7, 2017
    • Letters of Assurance Schedules – effective April 7, 2017
  • BCBC Revision 10 (PDF). New sprinkler requirements for four-storey wood-frame buildings, effective July 20, 2017
  • BCBC Revision 9 (PDF, 1 MB). Energy efficiency and secondary suites, effective December 21, 2015
  • BCBC Revision 8 (PDF, 1 MB). Effective December 11, 2015
    • Windows, doors and skylights
    • Energy efficiency
    • Ventilation
    • Stainless steel plumbing 
  • BCBC Revision 7 (PDF, 17 MB). Ventilation, radon, daycares, NFPA, and editorial revisions. Effective December 19, 2014
  • BCBC Revision 6 (PDF, 5.24 MB). Editorial revisions. Effective December 19, 2014
    • Letters of Assurance Schedules, effective December 19, 2014
      • Schedule A (PDF). Confirmation of commitment by owner and coordinating registered professional
      • Schedule B (PDF). Assurance of professional design and commitment for field review (replaced by new Schedule B in Revision 11 on April 7, 2017)
  • BCBC Revision 5 (PDF, 3.43 MB). Energy efficiency for housing & small buildings. Effective December 19, 2014
  • BCBC Revision 4 (PDF). Energy efficiency, large residential & commercial buildings. Effective December 20, 2013
  • BCBC Revision 3 (PDF). Updated extension of NAFS compliance deadline for windows, doors, and skylights. Effective April 12, 2013
  • BCBC Revision 2 (PDF, 3.11 MB).  Editorial Revisions. Effective April 3, 2013
  • BCBC Revision 1 (PDF). Extension of NAFS compliance deadline for windows, doors, and skylights. Effective March 12, 2013

 

BC Fire Code 2012

 

BC Fire Code 2012 Revisions

BCFC Revision 1 (PDF). National updates. Effective April 5, 2013

 

BC Building and Plumbing Code 2006

 

BC Building Code 2006 Revisions

  • BCBC Revision 13 (PDF) Change to effective date of Revision 9,  effective February 1, 2011
  • BCBC Revision 12 (PDF) Referenced standard for concrete, effective November 5, 2010
  • BCBC Revision 11 (PDF) Change to effective date of Revision 9, effective date: September 30, 2010
  • BCBC Revision 10 (PDF) Registered professional of record;, Part 2 of Division C, effective July 19, 2010
  • BCBC Revision 9 (PDF) Maximum flush cycle for water closet and urinal (PDF includes Revision 13) , effective April 6, 2010
  • BCBC Revision 8 (PDF) Application of code, effective February 23, 2010
  • BCBC Revision 7 (PDF) Geotechnical slope stability regulation, seismic, effective December 22, 2009
  • BCBC Revision 6 (PDF) Adaptable housing, effective September 3, 2009
  • BCBC Revision 5 (PDF) Further structural requirements for 5 and 6 storey wood-frame construction, effective April 3, 2009
  • BCBC Revision 4 (PDF) Permission for 5 and 6 storey, mid-rise wood-frame construction, effective January 8, 2009
  • BCBC Revision 3 (PDF) Fire resistance ratings in Appendix D and opening in membrane ceilings, effective November 3, 2008
  • BCBC Revision 2 (PDF) Part 10 "Greening" of the BC Building Code requirements, effective April 8, 2008
  • BCBC Revision 1 (PDF) Stairs from garages, attic insulation, aluminum or vinyl cladding, effective April 23, 2007

 

BC Fire Code 2006

 

BC Fire Code 2006 Revisions

BCFC Revision 1 (PDF) BC Fire Code requirements for smoke alarms, effective February 23, 2010