Project No. 17093-0002

Last updated on September 11, 2026

Highway 19A Plummer Road Improvements – Phase 2


Submission for Tenders Expires: October 14, 2026

Project Number: 17093-0002

Contract ID: 17093MJ0002

Location: The site is located South of Englishman River Bridge in Parksville, BC along Highway 19A and the adjacent road Plummer.

Description: Construction of Multi-Use Pathway (MUP) south of Englishman River Bridge in Parksville, BC and north of Resort Drive. Realignment of Plummer Road and a crosswalk for pedestrians and cyclists. Resurfacing of Plummer Road, Highway 19A, and Riverside Road.

 

Document
Number

Document Description

1

PROPERTY ACQUISITION PLAN - R-1196-100RW

2

CROSS SECTIONS – R-1196-1000

3

SUGGESTED CONSTRUCTION STAGING – F-1196-1100

4

UTILITY RELOCATION PLAN

5

HWY 19A – PLUMMER ROAD IMPROVEMENTS PHASE 2 GEOTECHNICAL REPORT (FEBRUARY 20, 2026) – Thurber 20260220 – Geotechnical Design Report

6

HWY 19A – PLUMMER ROAD IMPROVEMENTS PHASE 2 STEP B – SOIL CHARACTERIZATION (MARCH 19, 2026)

7

HWY19A PLUMMER ROAD PHASE 2 ENVIRONMENTAL OVERVIEW ASSESSMENT REPORT (MAY 12, 2026)

8

TIMBER EVALUATION AND TREE RISK ASSESSMENT: PLUMMER ROAD IMPROVEMENTS PHASE 2 (APRIL 15, 2026)

9

WHISKEY CREEK PIT #2937 LOCATION PLAN (FEBRUARY 4, 2026)

10

KAYE ROAD PIT #0055 LOCATION PLAN (JUNE 10, 2026)