Rail Overhead Replacement

Last updated on September 18, 2026

CPKC Replacement Railway Crossing

Construction is underway on the Rail Overhead Replacement Project.

Project highlights

Artist rendering of the Rail Overhead Replacement which will be 160 m long and 5.2 m high

  • Replacing the existing railway box structures with a 160 m long overhead rail crossing with an increased height of 5.2 metres
  • Widening Highway 1 with additional HOV lanes eastbound and westbound
  • Realigning 2 km of rail within the rail right-of-way

Status

The Rail Overhead Replacement Project is under construction. Completion is anticipated in 2029.

Cost

The contract is valued at $74.2 million and was awarded to Norland Kingston General Partnership.

 

 

Contact information

Fraser Valley Highway 1 Corridor Improvement Program Logo-showing BC Sun with green valley and road running through

Friendly url for this page:
gov.bc.ca/railoverheadreplacement

News Room
Find news about Highway 1 - 216th to 264th Widening Project

Program Enquires Phone
604-527-2221