1977 |
55 |
18.6 |
1977 Bulk Sample Program.pdf |
1977 |
13 |
0.6 |
1977 Reclamation Rpt & Proposed Prgm for 1978.pdf |
1979 |
166 |
8.6 |
1979 Environmental Field Programs.pdf |
1979 |
53 |
3.2 |
1979 Reclamation Report.pdf |
1980 |
122 |
5.9 |
1980 Environmental Field Programs.pdf |
1981 |
28 |
1.1 |
1981 Reclamation Report.pdf |
1981 |
84 |
6.6 |
1981 Site Invest Program Environment Report.pdf |
1983 |
11 |
0.4 |
1983 Reclamation Report.pdf |
1977 |
322 |
9.9 |
Appendix 3 - Coal Cleaning Predictions.pdf |
1978 |
137 |
20.7 |
Benefication 2nd Draft June 1978.pdf |
1978 |
95 |
20.3 |
Benefication Interim Report Vol 2 Oct 1978.pdf |
1978 |
264 |
8.6 |
Benefication Interim Report Vol 3 Oct 1978.pdf |
1978 |
162 |
5.0 |
Benefication Interim Report Vol 4 Oct 1978.pdf |
1982 |
62 |
4.7 |
Coal Cleaning Tests Dec 1982.pdf |
1981 |
182 |
12.1 |
Coal Liquefaction Project-Prefeasibility Study.pdf |
1983 |
56 |
3.6 |
Coal Preparation Report.pdf |
1981 |
409 |
12.1 |
Coal Utilization Study Nov 1981.pdf |
1977 |
156 |
10.1 |
Final Report - Vol 1 - Main Text.pdf |
1979 |
174 |
12.3 |
Fugitive Mine-Dust Study Oct 79 App C.pdf |
1977 |
323 |
21.2 |
Geotechnical Study - Vol 3 - Appendices 2-6.pdf |
1977 |
142 |
19.9 |
Hat Creek Coal Deposit-Proximate Analysis.pdf |
1981 |
290 |
20.5 |
Kelly Lk-Cheekye Trans Line Stage 1 Environ Study.pdf |
1979 |
104 |
5.8 |
MATS Handling Aug 1979.pdf |
1979 |
155 |
11.2 |
Mats Handling, Screening,Crushing Dec 1979 (2).pdf |
1979 |
145 |
9.7 |
Mats Handling, Screening,Crushing Dec 1979.pdf |
1982 |
163 |
10.2 |
Mining Field Program - 1982.pdf |
1982 |
107 |
4.6 |
Mining Field Program 1982 Trench D.pdf |
1982 |
214 |
17.3 |
Mining Report-Vol. 1.pdf |
1982 |
345 |
22.2 |
Mining Report-Vol. 2-App A.pdf |
1982 |
32 |
2.2 |
Mining Report-Vol. 3-App B.pdf |
1977 |
36 |
4.1 |
No Drawing Supplement.pdf |
1981 |
51 |
8.0 |
No 2 Deposit - Geotech and Hydrological Asses.pdf |
1977 |
99 |
17.7 |
Prelim Design-Modular Coal Washery.pdf |
1978 |
183 |
10.1 |
Preliminary Engineering-Comp.Report-App.A.pdf |
1978 |
192 |
12.6 |
Preliminary Engineering-Comp.Report.pdf |
1975 |
12 |
0.4 |
Preliminary Evaluation March 1975.pdf |
1977 |
118 |
8.8 |
Report of the Acid Rain Committee.pdf |
1976 |
33 |
19.6 |
Rpt 4 - Geotech Study - Interim Conclusions.pdf |
1977 |
32 |
1.9 |
Rpt 7 - Combined Pit Op Study for 5,000 MW Power Plant.pdf |
1977 |
77 |
12.2 |
Rpt 8 - Reclamation Study - Open Pit No 1.pdf |
1977 |
118 |
5.3 |
Rpt 9 - Revised Report on Open Pit No 1 - Vol 1.pdf |
1977 |
43 |
7.7 |
Rpt 9 - Revised Report on Open Pit No 1 - Vol 2.pdf |
1976 |
31 |
0.9 |
Rpt on Prelim Consideration of Sampling Plan Design.pdf |
1975 |
21 |
0.8 |
Summary Rpt - Stage 2 - Exploratory Drilling.pdf |
1978 |
76 |
4.3 |
Summary Volume.pdf |
1976 |
33 |
2.3 |
Thermal Plant - Diversion Study Dec 1976.pdf |
1976 |
23 |
1.7 |
VLF Electromagnetic Survey.pdf |
1978 |
127 |
22.4 |
Volume 2 - Geology and Coal Quality.pdf |
1978 |
218 |
12.2 |
Volume 3 - Mine Planning.pdf |
1978 |
104 |
20.3 |
Volume 4 - Mine Support Facilities.pdf |
1979 |
73 |
4.6 |
Volume 4 - Sec 3A - Mine Drainage.pdf |
1978 |
242 |
17.7 |
Volume 5 - Mine Reclam and Environ Protect.pdf |
1978 |
102 |
9.1 |
Volume 6 - Capital and Operating Costs.pdf |
1978 |
196 |
16.6 |
Volume 7 - Appendix A.pdf |
1978 |
129 |
20.6 |
Volume 8 - Appendix B.pdf |
1978 |
197 |
11.1 |
Water Supply and Ash Disposal - Prelim Rpt Vol 1.pdf |
1978 |
60 |
3.6 |
Water Supply and Ash Disposal - Prelim Rpt Vol 2.pdf |
1984 |
66 |
2.9 |
Water Supply System - Feasibility Study.pdf |