Hat Creek Collection - Miscellaneous Reports

Last updated on October 30, 2018

The Hat Creek Collection includes miscellaneous BC Hydro reports. There are 58 reports in this collection.

Hat Creek Collection - Miscellaneous BC Hydro Reports
Year No. of Pages Size (MB) File Name
1977 55 18.6 1977 Bulk Sample Program.pdf
1977 13 0.6 1977 Reclamation Rpt & Proposed Prgm for 1978.pdf
1979 166 8.6 1979 Environmental Field Programs.pdf
1979 53 3.2 1979 Reclamation Report.pdf
1980 122 5.9 1980 Environmental Field Programs.pdf
1981 28 1.1 1981 Reclamation Report.pdf
1981 84 6.6 1981 Site Invest Program Environment Report.pdf
1983 11 0.4 1983 Reclamation Report.pdf
1977 322 9.9 Appendix 3 - Coal Cleaning Predictions.pdf
1978 137 20.7 Benefication 2nd Draft June 1978.pdf
1978 95 20.3 Benefication Interim Report Vol 2 Oct 1978.pdf
1978 264 8.6 Benefication Interim Report Vol 3 Oct 1978.pdf
1978 162 5.0 Benefication Interim Report Vol 4 Oct 1978.pdf
1982 62 4.7 Coal Cleaning Tests Dec 1982.pdf
1981 182 12.1 Coal Liquefaction Project-Prefeasibility Study.pdf
1983 56 3.6 Coal Preparation Report.pdf
1981 409 12.1 Coal Utilization Study Nov 1981.pdf
1977 156 10.1 Final Report - Vol 1 - Main Text.pdf
1979 174 12.3 Fugitive Mine-Dust Study Oct 79 App C.pdf
1977 323 21.2 Geotechnical Study - Vol 3 - Appendices 2-6.pdf
1977 142 19.9 Hat Creek Coal Deposit-Proximate Analysis.pdf
1981 290 20.5 Kelly Lk-Cheekye Trans Line Stage 1 Environ Study.pdf
1979 104 5.8 MATS Handling Aug 1979.pdf
1979 155 11.2 Mats Handling, Screening,Crushing Dec 1979 (2).pdf
1979 145 9.7 Mats Handling, Screening,Crushing Dec 1979.pdf
1982 163 10.2 Mining Field Program - 1982.pdf
1982 107 4.6 Mining Field Program 1982 Trench D.pdf
1982 214 17.3 Mining Report-Vol. 1.pdf
1982 345 22.2 Mining Report-Vol. 2-App A.pdf
1982 32 2.2 Mining Report-Vol. 3-App B.pdf
1977 36 4.1 No Drawing Supplement.pdf
1981 51 8.0 No 2 Deposit - Geotech and Hydrological Asses.pdf
1977 99 17.7 Prelim Design-Modular Coal Washery.pdf
1978 183 10.1 Preliminary Engineering-Comp.Report-App.A.pdf
1978 192 12.6 Preliminary Engineering-Comp.Report.pdf
1975 12 0.4 Preliminary Evaluation March 1975.pdf
1977 118 8.8 Report of the Acid Rain Committee.pdf
1976 33 19.6 Rpt 4 - Geotech Study - Interim Conclusions.pdf
1977 32 1.9 Rpt 7 - Combined Pit Op Study for 5,000 MW Power Plant.pdf
1977 77 12.2 Rpt 8 - Reclamation Study - Open Pit No 1.pdf
1977 118 5.3 Rpt 9 - Revised Report on Open Pit No 1 - Vol 1.pdf
1977 43 7.7 Rpt 9 - Revised Report on Open Pit No 1 - Vol 2.pdf
1976 31 0.9 Rpt on Prelim Consideration of Sampling Plan Design.pdf
1975 21 0.8 Summary Rpt - Stage 2 - Exploratory Drilling.pdf
1978 76 4.3 Summary Volume.pdf
1976 33 2.3 Thermal Plant - Diversion Study Dec 1976.pdf
1976 23 1.7 VLF Electromagnetic Survey.pdf
1978 127 22.4 Volume 2 - Geology and Coal Quality.pdf
1978 218 12.2 Volume 3 - Mine Planning.pdf
1978 104 20.3 Volume 4 - Mine Support Facilities.pdf
1979 73 4.6 Volume 4 - Sec 3A - Mine Drainage.pdf
1978 242 17.7 Volume 5 - Mine Reclam and Environ Protect.pdf
1978 102 9.1 Volume 6 - Capital and Operating Costs.pdf
1978 196 16.6 Volume 7 - Appendix A.pdf
1978 129 20.6 Volume 8 - Appendix B.pdf
1978 197 11.1 Water Supply and Ash Disposal - Prelim Rpt Vol 1.pdf
1978 60 3.6 Water Supply and Ash Disposal - Prelim Rpt Vol 2.pdf
1984 66 2.9 Water Supply System - Feasibility Study.pdf