Whistler
Whistler Master Plan
- Whistler Master Plan Update 2013 (PDF, 4MB)
Maps
* Please note, some of these PDF documents are large in size and may be slow to open. It is recommended that you save the document to your computer prior to opening.
- Figure 1 - Area Location (PDF 2.5 MB)
- Figure 2 - The Study Area (PDF 7.6 MB)
- Figure 3 - Aspect Analysis (PDF 2.7 MB)
- Figure 4 - Elevation Analysis (PDF 2.8 MB)
- Figure 5 - Fall Line Analysis (PDF 2.7 MB)
- Figure 6a - Solar Analysis 900 hrs (PDF 2.5 MB)
- Figure 6b - Solar Analysis 1200 hrs (PDF 2.6 MB)
- Figure 6c - Solar Analysis 1500 hrs (PDF 2.5 MB)
- Figure 7 - Solar Radiation Analysis (PDF 3.2 MB)
- Figure 8a - Existing Mountain Facilities (PDF 6.1 MB)
- Figure 8b - Existing Mountain Facilities (PDF 71.1 MB)
- Figure 9 - Existing Snowmaking Coverage (PDF 5.3 MB)
- Figure 10 - Olympic Facilities (PDF 2.2 MB)
- Figure 11a - Parking and Circulation Central Village (PDF 2.7 MB)
- Figure 11b - Parking and Circulation at Creekside (PDF 0.8 MB)
- Figure 12a - Existing Summer Recreation Plan (PDF 3 MB)
- Figure 12b - Existing Downhill Mountain Bike Park (PDF 2.1 MB)
- Figure 12c - Existing Winter and Spring Recreation Plans (PDF 2.9 MB)
- Figure 12d - Existing Summer Recreation Plan - Village (PDF 0.6 MB)
- Figure 13a - Mountain Slope and TCA (PDF 4.8 MB)
- Figure 13b - 3D Mountain Slope and TCA (PDF 1.6 MB)
- Figure 13c - Cheakamus Base Development Slope Analysis (PDF 3.7 MB)
- Figure 14a - Mountain Master Plan at Buildout (PDF 8.1 MB)
- Figure 14b - Dave Murray National Training Centre (PFD 0.6 MB)
- Figure 14c - Whistler Village - Contolled Recreation Area (PDF 2.2 MB)
- Figure 15 - Snowmaking Coverage at Buildout (PDF 5.5 MB)
- Figure 16- Summer Recreation Plan at Buildout (PDF 3.1 MB)
- Figure 17 - Valley Staging Lifts at Buildout (PDF 5.6 MB)
- Figure 18 - Proposed Cheakamus Base (PDF 0.7 MB)
- Figure 19 - Cheakamus and South Base Development (PDF 2.8 MB)
- Figure 20 - Whistler Mountain Master Plan with Potential Development Sites (PDF 7.4 MB)