The Producer's request for release of a royalty deduction under the Clean Growth Infrastructure Royalty Program for an approved and constructed infrastructure project must be submitted within six months from the completion date of the project, as outlined in the Project Agreement.
To request the release, the Producer must include copies of all completed Schedule B documents and the original signed Statutory Declaration form and cover letter. Please see below for required documents for each project type.
Project Type: |
Growth Project |
Sustainability Project |
|||
Road Infrastructure |
Pipeline Infrastructure |
Value-Add Infrastructure |
Electrification Infrastructure |
Emissions Reductions Infrastructure |
|
Required Documents (denoted with X) |
|||||
Cover Letter |
X |
X |
X |
X |
X |
Statutory Declaration |
X |
X |
X |
X |
X |
Detailed List of Invoices |
X |
X |
X |
X |
X |
Well Information for Royalty Deduction |
X |
X |
X |
|
|
Road Layout and Design |
X |
|
|
|
|
True copy of ‘Leave to Open’ |
|
X |
If applicable |
|
|
Emissions Reduction Report |
|
|
|
X |
X |
The format and/or template for each required document is provided below.
1. Royalty Submission Cover Letter (DOC)
2. Statutory Declaration of Completion (DOC)
3. Detailed List of Invoices (XLS)
4. Well Information for Royalty Deduction (XLS)
6. Emissions Reductions Report
7. True copy of "Leave to Open" for the Project from the Oil and Gas Commission or a "Leave to Open" granted by the Canada Energy Regulator.
Electronic copies (via email) should be submitted to the CGIRP Senior Project Manager.