Project No. 26379-0000

Last updated on January 24, 2024

Highway 95 - Kicking Horse River Bridge 1 and 2 Replacement and Approaches


Submission for Tenders Expires: February 8th, 2024

Project Number: 26379-0000

Contract ID: 26379MJ0000

Location: Highway 95 in Golden, BC.

Description:

Works include but not necessarily limited to: Survey layout, traffic management, quality management, supply and install bridges and foundation components, removal and disposal of existing structures, produce and supply granular materials, electrical, approach grade construction, supply/place asphalt pavement, supply and install roadside barriers, temporary pavement markings, pedestrian underpass construction, park and site restoration and cleanup.

"THE PROJECT WILL RECEIVE FUNDING FROM THE FEDERAL GOVERNMENT UNDER THE CANADA-BRITISH COLUMBIA DISASTER MITIGATION AND ADAPTATION FUND (DMAF)"

 

Document
Number

Document Description

1

Final Preliminary Geotechnical Report, Highway 95 - Kicking Horse River Bridges, Golder Associates Ltd., October 1, 2020

2

Kicking Horse River Bridges Replacement Project, Geotechnical Factual Data Report – Phases 1 and 2, Tetra Tech Canada Inc., May 3, 2022

3

Kicking Horse River Bridges Replacement Project, Geotechnical Design Report, Tetra Tech Canada Inc., July 21, 2023

4

Suggested Construction Staging Plan

5

Preliminary Environmental Impact Assessment Report, Triton Environmental Consultants, January 10, 2023

6

Kicking Horse River Bridges Replacement and Approaches Design Sections

7

Hydrotechnical Report Detailed Design, Town of Golden, BC, Version 1.0, Matrix Solutions Inc., December 2022, Project 5635-522

8

Ice Jam Monitoring and Response Plan - Highway 95 Bridges, Kicking Horse River, Golden, Version 1.0, Matrix Solutions Inc., May 3, 2023

9 List of Known Rafting-Kayaking Companies, Golden BC
10 Environmental Plans 
11 Landscape Drawings 
12 Landscape – Kiosk Design and Details
13 Landscape – Trail Head Wayfinding Sign
14 Existing Kicking Horse River Bridge Record Drawings
15 BC Hydro Phase 1 – Temporary Works
16 Composite Utility Plan
17 Watermain Staging
18 Existing Watermain Isolation Valves
19 Ben Hynes Pit No. 1102 2023 Technical Information Report
20 Ben Hynes Pit #1102 Location Plan (2023)
21 Ben Hynes Pit #1102 Legal Plan (2023)
22 Ben Hynes Pit Sulphate Testing Lab Report, CARO Analytical, November 24, 2023
23 Golden Bridge to Bridge Dike Improvements, Geotechnical Report, McIntosh Lalani Engineering Ltd, January 30, 2019
24 Hydrotechnical Design Report, Town of Golden, BC, Version 1.0, Matrix Solutions Inc., October 2018
25 Ice Loading Calculations, Town of Golden, BC, V1.0, Matrix Solutions Inc., February 27, 2019
26 Town of Golden Ice Monitoring Station
27 Town of Golden Lighting Records for Riverwalk
28 Golden Hill Pit #1098 Location Plan (2023)
29 Golden Hill Pit #1098 Legal Plan (2023)
30 Highway 95 Kicking Horse River Bridges Replacement Project, Technical Memo – Geotechnical Input for Block Walls, Tetra Tech Canada Inc., November 27, 2023
31 Town of Golden Water Monitoring Connections
32 Sulphate Chloride Testing, CARO Analytical, 2023-11-24
33 Demolition Concept
34 Erection Concept
35 Tender Data
36 BC Hydro Final Relocation Design