Project No. 24913-0001

Last updated on June 5, 2023

Trans Canada Highway No. 1 Ford Road to Tappen Valley Road


Submission for Tenders Expires: June 27, 2023

Project Number: 24913-0001

Contract ID: 24913MJ0001

Location: Tappen, BC on Trans Canada Highway 1.  Tappen is located approximately 10 km north of Salmon Arm.

Description: The project will upgrade approximately 4.3 km of the Trans-Canada Highway (TCH) from two lanes to four and replace the Tappen Overhead Bridge.  Other improvements include a new frontage road system, installation of median barrier, new eastbound commercial carrier pullout, a modified protected T-intersection at Tappen Valley Road, replacement of the White Creek Culvert, and the replacement of the Tappen Creek Culvert with a new bridge/wildlife underpass.

 

Document
Number

Document Description

1

R2-735-450 – Truck Turning Movements

2

R2-735-750 – Third Party Utility Relocations

3

R2-735-950 Roadways Construction Staging Overview

4

R2-735-960-964 White Cr Cons Stg Dwgs_IFT_20230214

5

R2-735-965-966 Tappen Cr Cons Stg Dwgs_IFT_20230214

6

R2-735-971 to 977 Tappen OH Staging Drawings

7

R2-735-1000_Cross Sections

8

2021-04-19_FA_Authorization

9

2021-04-19_FA_Letter_to_Proponent

10

20191218011300PhIIIESACoop

11
 
2019121221210011300PhaseIIESAAutoFinal

12
 
Tappen_Overhead_As_Builts

13
 
Hydrotech Report Tappen_White Creek_2020515

14
 
EA12_19_2019F0withappendix

15
 
FLNROD Change Approval A3006651

16
 
20200508_Hwy 1 Ford to Tappen Factual Report

17
 
20200904_H1 Ford Tappen IFT Geotech Design Report
18
 
58712d1 (TRAN) – ALC Application

19
 
58712 (TRAN) Schedule B – ALC Application

20
 
58712 (TRAN) Schedule C – ALC Application

21
 
RP_Project Overview

22
 
Deleted

23
 
Amended-and-Restated-Community-Benefits-

24
 
BCIB - Ford to Tappen - Apprenticeship and Training Targets - Final

25
 
BCIB Health and Safety Policy-2022

26
BCIB-Contractor Agreement - Ford to Tappen (with
BSA attached)

27
 
Tappen OH Pier Bent #3 and #4 Removal Drawing 20230424

28

R2-735-116 – Updated for Reference


29

R2-735-117 – Updated for Reference
 

30

2300_TenderData 01_PlanSetPDFDrawings Part 1
 

31

2300_TenderData 01_PlanSetPDFDrawings Part 2
 

32

2300_TenderData 01_PlanSetPDFDrawings Part 3
 

33

2300_TenderData 02_100MSPlanPDFandDWG
 

34

2300_TenderData 03_SurveyControl
 

35

2300_TenderData 04_ExistingSurfaces
 

36

2300_TenderData 05_AlignmentProfiles
 

37

2300_TenderData 06_ProposedSurfaces
 

38

2300_TenderData 07_ProposedGravityNetworks
 

39

2300_TenderData 08_EarthworksVolumeReports
 

40

Condition Inspection Report - White Cr Culvert 2018-11-30

41

IR5 Domestic Water System Improvements - 2059-01-C-1001 and D-5003

42

Tappen Pumphouse Information

43