Project No. 14031-0002

Last updated on April 26, 2024

Highway 11 at Willband Creek Flood Repairs


Submission for Tenders Expires: May 8, 2024

Project Number: 14031-0002

Contract ID: 14031MJ0002

Location: Highway 11 between Valley Road and Bateman Road north of Abbotsford, BC.  The Site is on the northbound lanes in LKI Segment 2776, between km 1.16 Valley Road and 1.79 Bateman Road.

Description: The work is the permanent repair to correct damage caused by flooding using deep soil mixing. The work involves relocation of barriers for traffic control, remove of existing EPS blocks and underlying road base, construction of a working platform, cutter deep soil mixing, reinstatement of road base, resurfacing and restoration of the site.

 

Document
Number

Document Description

1

Hwy 11 Flood Repairs - Geotechnical Data Report

2

Hwy 11 Flood Repairs – Surface Runoff Adequacy Assessment Memo

3

Hwy 11 Flood Repairs - Day Labour Drawings 

4

Hwy 11 Flood Repairs - Day Labour Drawing Sections

5

Hwy 11 Flood Repairs – TCP Plan 

6

Hwy 11 Flood Repairs – TCP Cross Sections

7

Hwy 11 Flood Repairs - Design Criteria Sheet for Climate Change Resilience

8

Hwy 11 Drawing-Mission-Abbotsford-Sumas Way to Clayburn Rd

9

Signal and Lighting Installation-Hwy 11 at Valley Road-Abbotsford