Okanagan Valley Corridor - Current Projects

Highway 97 - John Hindle Drive Extension

Connecting John Hindle Drive from the Glenmore Landfill to UBC Okanagan Campus at Alumni Avenue (1.8 km).

Status: Under Construction


Highway 97 – Boucherie and Westlake Road Intersections

Now in the planning stage, improvements to the Highway 97 intersections at Boucherie and Westlake Roads will improve safety and traffic flow along the Highway 97 corridor.

Status: In conceptual planning


Highway 97 – Six-Laning Highway 33 to Edwards Road

Urban widening from four to six lanes of Highway 97 in Kelowna from Highway 33 to Edwards Road, and other  access and intersection improvements.

Status: Construction started in April 2016


Highway 97 – Stickle Road Intersection

Reconfiguration of the intersection at Stickle Road and Highway 97 to improve safety and mobility.

Status: Currently in preload construction phase


Westside Road – West Kelowna to Highway 97 North of Vernon

Improvements along the west side of Okanagan Lake from West Kelowna to Highway 97 near O'Keefe Range (approximately 65 km).

Status: Construction and project development is ongoing.


Westside Road - La Casa to Muir Road

The 1.1 km La Casa to Muir Road project is part of the Province's commitment to the residents of the area to improve safety along Westside Road.

Status: In design


Westside Road - Pine Point to Four Mile Creek

The 1.3 km Pine Point to Four Mile Creek  project is part of the Province's commitment to the residents of the area to improve safety along Westside Road. This project continues south from the Four Mile Creek to Waterfront Farm project.

Status: In Design