Project No. 35575-0002 Schedule T3 - Specific Reference Documents

Highway 97 Stone Creek Bridge No. 10134


Submission for Tenders Expires: April 25, 2018 Extended from April 18, 2018

Project Number: 35575-0002

Contract ID: 35575MJ0002

Location: 16 km west of Chetwynd on Highway 97.

Description: Replacement of the existing culvert at Stone Creek with a new single span bridge and creek channel works. The work includes the installation of a temporary detour bridge, removal of the existing culverts, installation of a new single span bridge, approach road construction, new driveway construction, minor in-creek works, revegetation and site clean-up.

Document
Number

Document Description

T3-01

Stone Creek Detour Drawings, September 27, 2017 (PDF, 3.8 MB)

T3-02

Stone Creek Project Cross Sections, February 23, 2018 (PDF, 1.7 MB)

T3-03

Hydrotechnical Report for 35575 Stone Creek – Highway 97 N, November 10, 2017 (PDF, 13.3 MB)

T3-04

Geotechnical Report, Proposed Stone Creek Culvert Replacement, Highway 97 16 km West of Chetwynd, B.C., Project No. K-4578, December 5, 2017 (PDF, 2.5 MB)