Project No. 35481-0000 Schedule T3 - Specific Reference Documents

Highway No. 97 - Bowlder Creek Bridge No. 10133


Submission for Tenders Expires: May 9, 2018

Project Number: 35481-0000

Contract ID: 35481MJ0000

Location: Bowlder Creek Crossing on Highway 97 approximately 25km southwest of Chetwynd, BC near the Hasler Road and Highway 97 intersection.

Description: The work includes replacement of the existing culvert with a new two lane, single span bridge 30.5m in length consisting of steel I-girders on steel pile piles with precast concrete abutments, cast-in-place deck and parapets. Work also includes the re-construction of 335m of highway approaches, channel protection and flow diversion, supply and installation of a two lane detour bridge, the construction of 380m of detour approaches. Detour is to be removed and site restored.

Document
Number

Document Description

T3-1

Reference Sections – Dwg. No. R3-309-1001 -
Sta. 103+98 to Sta. 104+78
 (PDF, 235 KB)

T3-2

Reference Sections – Dwg. No. R3-309-1002 -
Sta. 104+80 to Sta. 105+21
 (PDF, 223 KB)

T3-3

Reference Sections – Dwg. No. R3-309-1003 -
Sta. 105+30 to Sta. 106+00
 (PDF, 231 KB)

T3-4  Bowlder Creek Bridge - Geotechnical Design Report – 2018 (PDF, 2.3 MB)
T3-5  Bowlder Creek Bridge - Hydrotechnical Design Report – 2018 (PDF, 10 MB)
T3-6  Bowlder Creek Bridge - Hydrotechnical Design Brief – 2018 (PDF, 1.2 MB)