Project No. 25698-0000 Schedule T3 - Specific Reference Documents

Asphalt Surfacing, Hwy 5A/97C Hamilton Hill Brake Check to Coldwater I/C, Monck Park Road and Hwy 5 Rut Mitigation (78.6 Lane Km)


Submission for Tenders Expires: January 18, 2022

Project Number: 25698-0000

Contract ID: 25698MJ0000

Location: Located on Highway 5A/97C, Highway 5 and Monck Park Road in the Merritt Area

Description: Scope of Work includes: Mobilization; Quality Management; Signing; Traffic Management and Control; Survey Layout; Aggregate Production; Remove and Replace CRB; Cold Milling; Asphalt Mix Design; Place 25mm WGB and Pulverize; Level Course, Asphalt Base Course and Top Lift Paving; Pavement Drainage; Temporary Pavement Markings; Shouldering; Joint Sealing; Site Cleanup and Restoration.

 

Document
Number

Document Description

1

Kirby Creek Pit No. 0619 – 2021 Technical Information Report

2

Kirby Creek Pit No. 0619 – Location Plan (Figure 1)

3

Kirby Creek Pit No. 0619 – Legal Plan (Figure 2)

4

Short Term Water Use Approval 3006744

5

Short Term Water Use Thompson Okanagan Location Info (Appendix A)