Project No. 23801-0001 Schedule T3 - Specific Reference Documents

Highway No. 1 - Chase Creek Road to Chase West


Submission for Tenders Expires: June 17, 2020

Project Number: 23801-0001

Contract ID: 23801MJ0001

Location: The Site is located on Trans Canada Highway, extending from the western entrance to the Village of Chase to the eastern limit of Neskonlith Indian Reserve No. 2 for approximately 3.6 km.

Description: Improve geometrics and construct a four-lane cross-section, including concrete median barrier, for approximately 3.3 km to achieve a 100 km/h design speed. Frontage road improvements will consolidate highway access to two improved intersections at Chase Creek Road and Shuswap Avenue which will be at-grade protected-tee intersections.  A grade-separated pedestrian crossing will improve active transportation connectivity between the Village of Chase and Neskonlith I.R. No. 2.

This contract will be delivered using a Community Benefits Agreement.

 

Document
Number

Document Description

1

Geotechnical Recommendations For Detailed Design

2

Geotechnical Assessment Technical Memo - KX137202.700

3

Supplementary Site Investigation for Settlement Estimation Technical Memo - KX13772B14

4

Environmental Testing for Concrete Deterioration Technical Memo - KX13772B14.001

5

Rock Excavation Hwy 1. Chase West Project

6

Pre-Demolition Hazardous & Regulated Materials Survey Grube Pit Trailer #380, Chase BC

7

BCIB AIRCC Community Benefits Agreement (CBA)

8

BCIB AIRCC/CBA Erratum 1, 2 and 3

9

BCIB Health and Safety Policy and Program

10

BCIB Contractor Agreement

11

BCIB Subcontractor Agreement

12

BCIB Apprenticeship and Training Targets

13

BCIB Building BC’s Skilled Worker Legacy

14

BC Hydro As Built

15

Turcotte Pit No. 0384 – 2020 Technical Information Report

16

Environmental Assessment:  Chase Creek Road to Chase West Four-Laning

17

Cross Sections Set

18

Suggested Construction Staging

19

Drainage Report

20

Geotechnical Comment – Grube Pit Erosion Mitigation

21

Suggested PAG Rock Placement Plan

22

Pre-excavation Columbia Ground Squirrel Mitigation Monitoring Summary

23

Hoffman’s Bluff to West Chase Road ML/ARD Assessment – ML/ARD Material Management Plan

24

Water Well and Septic Field Inventory and Review – Highway 4-Laning, Chase Creek Road to Chase West

25

Potential Topsoil Recovery Plan

26

Chase Creek Road to Chase West - 14 May 20 Pre-Tender Meeting Presentation

27

Data Package for Bidders Part 1 of 2 (For Information Only)

28

Data Package for Bidders Part 2 of 2 (For Information Only)

29

Chase Creek Road to Chase West - 28 May 20 Pre-Tender Meeting Presentation

30

T3 - Grube Pit Development Plan

31

T3 - Zg-008-3A