Project No. 23617-0002 Schedule T3 - Specific Reference Documents

Hwy 97 Stickle Road Intersection Improvements - Phase 2


Submission for Tenders Expires: February 14, 2018

Project Number: 23617-0002

Contract ID: 23617MJ0002

Location: Hwy 97 between Vernon and Swan Lake Junction, 0.96 km south of Stickle Road and continues 0.38 km to the north Landmark Inventory Segment 1120 from kilometer 4.06 to kilometer 5.4.

Description: Convert the existing Stickle Road Intersection to Left-In, Right-In and Right-Out. Lengthen the NB and SB left turn lanes along Hwy 97.  Provide right turn acceleration and deceleration lanes at the east and west approaches.  Milling and repaving of approximately 545 m of Hwy 97 travelled lanes.  

Document
Number

Document Description

1

L100-Line (Highway No. 97) Cross Sections (25 Sheets) (PDF, 13.5 MB)

2

L400-Line (Stickle Road) Cross Sections (2 Sheets) (PDF, 1.04 MB)

3

L600-Line (Frontage Road) Cross Sections (6 Sheets) (PDF, 3.11 MB)

4

C-01-Line (Curb Return 1) Cross Sections (2 Sheets) (PDF, 794 KB)

5

C-02-Line (Curb Return 2) Cross Sections (2 Sheets) (PDF, 856 KB)

6

C-03-Line (Curb Return 3) Cross Sections (2 Sheets) (PDF, 1 MB)

7

C-04-Line (Curb Return 4) Cross Sections (2 Sheets) (PDF, 932 KB)

8

C-0-Line (Curb Return 5) Cross Sections (3 Sheets) (PDF, 1.23 MB)

9

Culvert Cross Sections (1 Sheet) (PDF, 475 KB)

10

Geotechnical Investigation Stickle Road Intersection Project, Highway 97 Near Vernon, B.C. (Golder Associates, Nov. 2, 2015) (PDF, 2.01 MB)

11

Archaeological Impact Assessment Interim Report, Hwy. 97 Stickle Road (Terraarchaeology, June 25, 2015) (PDF, 1.76 MB)

12

Environmental Opportunities and Constraints for Highway Improvements, Highway No. 97 Near Vernon, B.C. (Golder Associates, Aug. 24, 2015) (PDF, 14.2 MB)

13

Alteration Permit 2017-0051 -Granted (PDF, 2.37 MB)

14

Use of Plastic Underground Services (PDF, 61 KB)