Project No. 23470-0000 Schedule T3 - Specific Reference Documents

Trans Canada Highway No. 1 - Donald to Forde Station Road, Four Laning


Submission for Tenders Expires: December 13, 2017

Project Number: 23470-0000

Contract ID: 23470MJ0000

Location: Trans Canada Hwy 1, located approximately 20 km west of Golden, BC

Description: Four Laning of the Trans Canada Highway between the Golden Weigh Scale and Forde Station Road.

Document
Number

Document Description

 

Design Cross Sections – MoTI Project 23470-0000, Trans Canada Highway No. 1, Donald to Forde Station Road, Four Laning – prepared by Urban Systems, dated February 20, 2017

 

Highway 1 JUVIS to Forde Station Road, Four Laning, Final Factual Geotechnical Report – prepared by Thurber Engineering Ltd., dated April 16, 2013

 

Trans Canada Highway 1 Donald to Forde Station Road, Four Laning, Project no. 23470-0000, Geotechnical Design Report, Revision 3 – prepared by Thurber Engineering Ltd., dated July 19, 2013

 

BC Hydro Donald East Relocate – 12 Pole Relocation HWY 1, Project Overview – Design #0003720065, prepared by BC Hydro, dated July 16, 2013

 

Draft Report – Trans Canada Hwy Environmental Assessment: JUVIS to Forde Station Road, Four Laning – prepared by Summit Environmental Consultants Inc., dated February 2013

 

Donald East Crossing Project Description and Proposed Mitigation Measures, prepared by Summit Environmental, dated March 18, 2013

 

Briefing Letter – TCH Kamloops to Alberta: Donald East, prepared by Summit Environmental, dated December 10, 2012

 

Existing WIM Slab, Reinforced Concrete Steel Details, Drawing R2-625-306 Rev. B, prepared by CH2MHILL, dated August 2005

 

Conditions of Entry for Construction Purposes - private properties within construction limits, January 2014, March 2014, and March 2014.