Project No. 12811-2018 Schedule T3 - Specific Reference Documents

Asphalt Resurfacing H1: Chilliwack to Yale Tunnel Miscellaneous Areas (42.3 Lane Km)


Submission for Tenders Expires: February 20, 2018

Project Number: 12811-2018

Contract ID: 12811MJ2018

Location: Asphalt Resurfacing H1: Chilliwack to Yale Tunnel, Miscellaenous Areas (42.3 Lane Km)

Description: Rehabilitation is by mill and fill of the existing pavement to a depth of 62.5mm with a Modified Class 1 Medium Mix (70% of the fines to be manufactured) using a Group A 80/100 Asphalt Cement. Work will also include repair of severely distressed areas of the Hunter Creek Rest Area and milling and filling of the Hunter Creek Scales to a depth of 125mm. Dogwood Valley Road will be rehabilitated by pulverizing and overlay.

Document
Number

Document Description

1

Othello Aggregate Test Hole Summary Sheet (PDF, 166 KB)

2

Othello Pit #0235 Location (PDF, 368 KB)

3

Othello Pit Development Plan (PDF, 983 KB)

4

Othello Pit Development Plan Ortho B (PDF, 1.5 MB)

5

Othello Pit Development Plan Ortho D (PDF, 2.4 MB)

6

RCLM Handbook 1995 (PDF, 5.8 MB)

7

Othello Pit Source Detail (PDF, 21 KB)

8

Sieve Analysis Report AGC0235-2013 (PDF, 540 KB)

9

Sieve Analysis Report AGC0235-2014 (PDF, 1.5 MB)

10

Health Safety and Reclamation Code for Mines in British Columbia – 2008 (PDF, 1.6 MB)

11

Aggregate Operators Best Management Practices Handbook for British Columbia – 2002 (PDF, 1.4 MB)

12

Health & Safety; A Practical Guide for Aggregate Operations (PDF, 4.9 MB)