Project No. 12808-2018 Schedule T3 - Specific Reference Documents

Asphalt Resurfacing Hot-In-Place Recycling H3: Manning Park (55.5 Lane KM)


Submission for Tenders Expires: January 23, 2018

Project Number: 12808-2018

Contract ID: 12808MJ2018

Location: Hwy 3 Manning Park between Sumallo Summit and Cambie Bridge

Description: Rehabilitation is by hot-in-place recycling of the existing pavement with an Admix consisting of a Modified Class 1 Medium Mix (70% of the fines to be manufactured) using a Group A 120/150 Asphalt Cement.

Document
Number

Document Description

1

Eleven Mile Sieve Analysis Reports (PDF, 4.3 MB)

2

Eleven Mile Location (PDF, 439.1 KB)

3

Source Detail Report – Eleven Mile (PDF, 17.7 KB)

4

RCLM Handbook 1995 (PDF, 5.8 MB)

5

11 Mile Test Pit Summary Sheet 1994-2012 (PDF, 115.5 KB)

6

11 Mile Pit Development Plan 1713 (PDF, 3.7 MB)

7

11 Mile Pit Development Plan 1713 Ortho (PDF, 2.5 MB)

8

Health Safety and Reclamation Code for Mines in British Columbia (PDF, 1.6 MB)

9

Aggregate Operators Best Management Practices Handbook for British Columbia – 2002 (PDF, 1.4 MB

10

Health & Safety; A Practical Guide for Aggregate Operations (PDF, 4.9 MB)