Project No. 12452-0001 Schedule T3 - Specific Reference Documents

Highway No. 7 Four Laning – Silverdale Avenue to Nelson


Submission for Tenders Expires: March 2, 2018

Project Number: 12452-0001

Contract ID: 12452MJ0001

Location: Highway 7 in Mission, between Silverdale Avenue to Nelson Street

Description:  Construction of two additional travel lanes on this section of Highway 7. Scope includes pre-loading and surcharging on the north and south side of the highway, installation of new culverts, installation of traffic islands, installation of conduit for future traffic signals at Chester Street and Highway 7, grading, paving and installation of median barrier.

"THE PROJECT WILL RECEIVE FUNDING FROM THE FEDERAL GOVERNMENT UNDER THE CANADA - BRITISH COLUMBIA NEW BUILDING CANADA FUND – PROVINCIAL – TERRITORIAL INFRASTRUCTURE COMPONENT – NATIONAL AND REGIONAL PROJECTS (NBCF-PTIC-NRP)."

Document
Number

Document Description

1

Project No. 12452-0001 – Cross Sections (PDF, 16.2 MB)

2

Project No. 12452-0001 – Construction Staging Concept (PDF 5.5 MB)

3

SLR Consulting (Canada) Ltd. – Highway 7 – Soil Characterization Report – April 2017 (PDF, 6.5 MB)

4

Golder Associates – Updated Hydraulic Impact Assessment: Highway 7 Improvement Project Between Silverdale Avenue and Nelson Street, District of Mission, British Columbia – October 11, 2017 (PDF, 1.7 MB)

5

Drainage Report: Highway 7 – Four Laning - Silverdale Avenue to Nelson Street – 100% Detailed Design – R.F. Binnie and Associates - December 2017 (PDF, 2.6 MB)

6

1972 Geotechnical Borehole Logs (PDF, 1.6MB)

7

Highway 7 Four Laning – Sliverdale to Nelson Street -  Geotechnical Factual Report – Klohn Crippen Berger – June 2013 (PDF, 2.7 MB)

8

Highway 7, 2017 Crossing Investigation – Auger Holes Logs Nov. 2017 (PDF, 378.6 KB)

9

Highway 7, Mission, BC – ConeTec CPT Investigation Report Nov. 2017 (PDF, 4.6 MB)

10

Memorandum: Inventory and Assessment of Water Supply Wells Highway 7 Corridor Enhancements, 4 - Laning Nelson to Silverdale, Mission BC – EXP - July 12, 2017 (PDF, 363.9 KB)

11

Surveyed Water Well Summary – Wells Sewage Inventory Tables (PDF, 106.9 MB)

12

Advance Clearing Work – Highway No. 7 Four Laning – Project No. 12452-2018 (PDF, 5.5 MB)

13

Project No. 12452-0001 – Preload Cross Sections (PDF, 7.9 MB)