Project No. 08900-0005 Schedule T3 - Specific Reference Documents

Highway 91/17 And Deltaport Way Upgrade Project - Delta Nature Reserve Boardwalk


Submission for Tenders Expires:  June 19, 2019

Project Number: 08900-0005

Contract ID: 08900MJ0005

Location: The site is located directly to the East of the Highway 91 Northbound to Nordel Way Eastbound Off Ramp in the Delta Nature Bog. The Project is located in Delta, BC.

Description:

Construction of approximately 167m of 2.0m wide boardwalk in the Delta Nature Reserve. Decommissioning and removal of approximately 186 metres of existing Boardwalk following construction of the new alignment. The Work will involve most common aspects of highway construction, as well as, without limitation, the following complex or unusual aspects; Co-ordination with the City of Delta, Metro Vancouver, and construction within an environmentally sensitive area.

 

THE PROJECT WILL RECEIVE FUNDING FROM THE FEDERAL GOVERNMENT UNDER THE CANADA-BRITISH COLUMBIA NEW BUILDING CANADA FUND, NATIONAL INFRASTRUCTURE COMPONENT, (NBCF-NIC) - VANCOUVER FRASER PORT AUTHORITY

 

Document
Number

Document Description

1

Technical Data Sheet Postech Pile P312

2

BINN8545 Water Type Survey v1.0

3

Existing Boardwalk Photo

4

BMPs for trails in and around wetlands