4.17 Appendices

4.17.1 Project Tracking Checklist

Use this checklist to prepare a record of key outputs prepared by consultants or maintainers and sign-offs by the ministry.

4.17.2 Forest Service Bridge Design Checklist

4.17.3 CRP Crossing Assurance Statement

This document is for bridges, major culverts and other structures. It should be submitted with record drawings and documents after construction.

4.17.4 POR Construction Assurance Statement

This document is for bridges, major culverts and other structures. It should be submitted with record drawings and documents after construction.

4.17.5 Acceptance of Bridge & Major Culvert Drawings & Specifications

This document is to be completed by the ministry engineer prior to construction.