Operational Planning Self Assessment Quiz Module 5
Module 4 — Self-assessment quiz |
1. | List 3 to 4 general planning procedures for biodiversity management at the stand level. | General Planning Procedures for Biodiversity Management at the Stand Level |
2. | Why is it important to recognize that windthrow (blowdown) is a naturally occurring phenomenon? | Windthrow |
3. | List three windthrow considerations in patch planning. | Windthrow considerations in patch planning |
4. | List one windthrow consideration in riparian areas. | Windthrow considerations in riparian areas |
5. | Name two factors of a cutblock design. | Windthrow considerations in riparian areas |