BCTAC2019-BCSupplementToTAC - Revisions 2021-04-20 Chapter 100 - 100.3.5 specify project deliverables checklist to be completed with each submission - specify project data archive delivered to Field Services in most cases at 90% DD - change for wording consistency to 100% DD bullet 2 of 3 - 100.4.6 added section - 100.5.5.12 correct first reference to point to 100.11.3 - add to typical documentation "Construction Tender Data Package - specify "or electronic" for ringed binder - eliminate out-of-date "Project Supervisor" wording, just Project - improve wording to "Project Data Archive and Deliverables including checklist (see Section 1280)" - improve wording to "Designers should submit to the Project Manager the following Tender Documents as applicable:" - as part of Schedule T3 deliverable - specify to "Provide the Construction Tender Data Package (as defined in Section 1280)" - 100.8.1 add "Construction Tender Data Package" wording - Printing instructions to update published hard copy - Printing instructions to update existing printed copies from previous PDFs - Chapter 100 - print entire new chapter (double-sided in color) and replace all pages 2020-11-26 Chapter 100 and 1200 - Add note on environmental permitting drawing requirement to 100.5.4.1 - Correct bad numbering in 100.4.4 - Add BC1C website to section 100.5.5.6 - Add sample drawing as Figure 1220.S - Add environmental permitting drawing requirement to Project Deliverables Checklist - Printing instructions to update published hard copy - Printing instructions to update existing printed copies from previous PDFs - assumes previous changes below have already been incorporated - Chapter 100 - print pages 100-5 to 100-16 (print double sided) - replace old pages with new printed pages - Chapter 1200 - print page 1220-31 from the Chapter 1200 11x17 PDF and add as a new page - print the following pages from Chapter 1200 8½x11 PDF and replace current pages - pages 1-4 (1200-1 to 1200-4) double-sided - pages 21-22 (1220-11 to 1220-12) double-sided 2020-08-25 Chapter 100 - Revision to Chapter 100 - 100.9 replaced with new/revised content - sample/typical checklists are no longer provided within the chapter - links are now provided to typical checklists, etc. - references to section 100.11.3 or later updated for removal of checklists - chapter now refers to QA/QC documents as "typical" instead of "example" or "sample" - typical means the document is intended to be modified to suit a particular project - added heading 100.3.1.1 for Typical Planning Stage Studies (content reworded for readability) - replaced "BC MoTI" with "Ministry" througout the chapter - 100.5.4.4 changed "Revised Policy for Mitigating ... Noise" to "new Noise Policy for mitigating ... noise" - 100.5.5.1 (and forward) Chapter 100 now uses the word "acceptance" instead of "approval" - all links checked and revised as needed - chapter is 24 pages long instead of 48 - section 100.11.3 is now the last section - section 100.11.3 contains a list of sheets/checklists with a link to the website - Printing instructions to update published hard copy - Printing instructions to update existing printed copies from previous PDFs - assumes previous changes below have already been incorporated - print entire chapter (print double-sided) - replace entire chapter 2020-07-16 Chapter 100 - Previous version was 46 pages, new version is 48 pages - Change to 100.11.13 Typical Design Checklists - Page 100-26 replaced with 4 pages 100-26 to 100-29 - Page 100-27 to 100-41 unchanged, renumbered to 100-30 to 100-44 - Page 100-42 blank page eliminated - Printing instructions to update published hard copy - published hard copy includes these changes - Printing instructions to update existing printed copies from previous PDFs - print new pages 100-25 to 100-44 (print double-sided) - replace old pages 100-25 to 100-42 with new printed pages 2020-06-24 Chapter 1200 - Page 1210-3 - previous wording Use of the digital signature and electronic sealing is expected to be made mandatory at a future date pending further discussion with the Consulting Engineers of BC. Until digital signatures become mandatory, it will still be acceptable to submit drawings that are hand stamped and signed. - new wording Use of the digital signature and electronic sealing is strongly encouraged, while it will still be acceptable to submit drawings that are hand stamped and signed. - Printing instructions to update published hard copy - published hard copy includes these changes - Printing instructions to update existing printed copies from previous PDFs - print pages 1210-3 to 1210-4 (print double sided) - replace old pages with new printed pages