Highway 97 from Highway 33 to Edwards Road

The project includes urban widening from four to six lanes of Highway 97 in Kelowna from Highway 33 to Edwards Road, as well as intersection and access improvements. The project encompasses:

  • Widening Highway 97 to six lanes (4.5 km)
  • Upgrades to major intersections (Leathead, McCurdy, Findlay/Hollywood and Sexsmith Roads)
  • Realignment of Rutland Road to reduce congestion and increase separation between Highway 97 and Rutland Road

Status:

Construction started in April 2016

Project Benefits

  • Improve safety, mobility and efficiency
  • Better intersection configuration (left turn bays and deceleration lanes)
  • Reduce congestion and delays

Schedule

  • Realignment of Finns Road completed in November 2015
  • Main construction contract was awarded to Emil Anderson Construction in March 2016
  • Construction started in April 2016
  • Anticipate construction completion by fall 2017

Public Consultation

Project Design

Highway 97 Six Laning from Hwy 33 to Edwards Road Project Board

Connect with TranBC

Connect with TranBC - Blog Link

Useful Contacts

For information about the Highway 97 from Highway 33 to Edwards Road project, contact:

Rampaul Dulay
Project Manager
Telephone: 250 852-5906


Contact us for general information about the Okanagan Valley Corridor program.

Email
Telephone: 250 387-3198

Share Button