Highway 1 - Kamloops to Alberta - Completed Projects - clone

Balmoral Road to Broderick Creek Property

Four-laning of 2.8 km of highway and intersection improvements at Notch Hill Road along Highway 1 between Chase and Salmon Arm.

Status: Completed 2001


Broderick Creek to Ford

Four-laning of 4.2 km of highway, reconstruction of White Lake Road intersection, including grade separation and improvements to 3.1 km of frontage roads between Chase and Salmon Arm.

Status: Completed 2004


Clanwilliam Overhead

Four-laning of 2.3 km of highway near Revelstoke, including replacement of the Clanwilliam overhead with a new four-lane structure.

Status: Completed 2013


Craigellechie Overhead

Replacement of Craigellechie railway overhead and improvements to the Lybarger Road intersection at Highway 1.

Status: Completed 2001


Donald Bridge

Four-laning of 4 km of highway near Golden, including replacement of Donald Bridge with a new four-lane structure and replacement of CP Rail overhead.

Status: Completed 2013


Hilltop Road to Balmoral Road

Four-laning of 4.8 km of highway near Chase, including side road improvements, new interchange and upgrades to at-grade intersections.

Status: Completed 2011


Hospital Road to Highway 97B

Urban highway improvement in Salmon Arm including upgrades to and realignment of 4 km between 6th Street NE and Highway 97B to a four-lane design standard.

Status: Completed 2006


O'Connor Interchange

Construction of interchange at Kokanee Way east of Kamloops to replace two intersections and realignment of 2.4 km from O’Connor Road to east of Peerless Road.

Status: Completed 2001


Woods Overhead

On Highway 1 west of Revelstoke, replacement of Woods overhead structure and upgrades to 1.5 km to 100 km/h design standard that will accommodate future four lane construction.

Status: Completed 2004