Project No. 24111-0000 Schedule T3 - Specific Reference Documents

Asphalt Surfacing – Highway 5 Mad River to Regional Boundary and Clearwater Valley Road (97.4 Lane Km)


Submission for Tenders Expires: March 27, 2017

Project Number: 24111-0000

Contract ID: 24111MJ0000

Location:  Highway 5 North from Mad River to the Regional Boundary - Approximately 67 Km North of Littlefort.

Description: Asphalt Surfacing Highway 5 Mad River to Regional Boundary and Clearwater Valley Road (97.4 Km)

Work Includes: Quality and Traffic Management and Signing, Install and Maintain Project Signs, Survey Layout, Site Modifications, Aggregate Production Asphalt Mix Design, Cold Milling, Remove and Replace CRB, Supply and Install CRB, Base Repairs, Supply and Apply Emulsified Tack Coat, Level Course, Bottom and Top Lift Paving, Apply Joint Adhesive, Temporary Pavement Markings, Shouldering, Supply and Apply Joint Sealant, Site Cleanup.

Document
Number

Document Description

 

Brookfeild Creek Pit No. 2833 - 2017 Technical Information Report (PDF, 1.9 MB)

 

Brookfield Creek Pit No. 2833 Location Plan (PDF, 364 KB)

 

Brookfield Creek Pit No. 2833 Legal Plan (PDF, 279 KB)