Project No. 23769-0000 Schedule T3 - Specific Reference Documents

Penticton Green Mountain #2 Bridge No. 06155 Replacement


Submission for Tenders Expires: April 3, 2017

Project Number: 23769-0000

Contract ID: 23769MJ0000

Location: The project is located on Green Mountain Road approximately 9 km west of the junction of Highway 97 and Green Mountain Road.

Description: Work consists of construction of a new two lane, single span, 22.6 metre long bridge with 800mm deep prestressed concrete box stringers, cast-in-place concrete abutments and retaining walls, steel rails, riprap protection, as well as detour design, construction and restoration and approximately 450 metres of asphalt paved approaches plus demolition and disposal of the existing bridge.

Document
Number

Document Description

1

Hydrotechnical Report (PDF, 4.2 MB)

2

Geotechnical Memo (PDF, 657 MB)

3

Archaeological Impact Assessment (PDF, 4.9 MB)

4 Environmental Assessment (PDF, 5.2 MB)
5 Existing Bridge Sketch Plan (PDF, 75 KB)
6 Conceptual Detour (PDF, 677 KB)
7 Lot 909 Location Plan (PDF, 264 KB)
8 Lot 909 Property Plan (PDF, 471 KB)