Project No. 12723-0001 Schedule T3 - Specific Reference Documents

Highway 91 - Alex Fraser Bridge Capacity Improvements Project Phase 1 - Bridge Median Barrier Removal and Nordel Way Interchange Improvements


Submission for Tenders Expires: September 28, 2017

Project Number: 12723-0001

Contract ID: 12723MJ0001

Location: Alex Fraser Bridge deck and approaches - Hwy 91 in Delta BC.

Description:

Phase one work involves; removal of the existing cast-in-place median barrier on the bridge, cast-in-place concrete deck infill overlay, widening of the existing Nordel Way northbound on-ramp, installation of a cast-in-place retaining wall under the Nordel Way underpass in preparation for a future additional southbound lane, traffic signal and lighting at Nordel Way northbound on-ramp,regrading a portion of the southbound Nordel off-ramp to the scales/South Fraser Perimeter Road, Snow and Ice Management.

"THE PROJECT WILL RECEIVE FUNDING FROM THE FEDERAL GOVERNMENT UNDER THE CANADA-BRITISH COLUMBIA NEW BUILDING CANADA FUND - PROVINCIAL TERRITORIAL INFRASTRUCTURE COMPONENT - NATIONAL AND REGIONAL PROJECTS (PTIC-NRP)."

Document
Number

Document Description

1

L100-Line Cross Sections (PDF 507, KB)

2

L500-Line Cross Sections (PDF 758, KB)

3

L800-Line Cross Sections (PDF 481, KB)

4 L900-Line Cross Sections (PDF 447, KB)
5 Suggested Construction Detour for L900 Ramp (PDF 666, KB)
6 Roadway, Monthly Hourly Volume for September 2016 (PDF 96, KB)
7 AFB-Phase 1-Reference Dwgs (PDF 77, MB)
8 Collar Storage Bin (PDF 224, KB)
9 Alex Fraser Bridge – Cable Condition Survey Report (PDF 3.2, MB)