FFT Site Preparation Activity

Last updated on August 3, 2018

This activity requires that a mapping standard, an overall standard (FS1001), and an activity-specific standard be followed. Where a Site Preparation Project requires Access considerations, additional standards identified on the access page will need to be entered into PINES.

Activity Standards

Other Related Information

If this activity occurs in a declared and known area that impacts a species or ecosystem at risk, an identified wildlife species, or a regionally important species, the applicant must indicate in their PINES submission the specific species/ecosystem and have available, on request, the location of recovery plans and/or other documents that detail the protective measures to be taken.

Useful Forms and Templates

By downloading these documents you have waived the Ministry/Province from any liability and save harmless the Ministry/Province from the use of the these contract documents.

Provincial Version

Recipient Version

Contact information

For information on Ungulate Winter Range (UWR), regionally important species, or other local issues, discuss with your Ministry of Environment contact.